![]() ![]() Tedious, but you will have the deck you want. I suggest you use an impact to remove the screws, pull up the planks, cut off extra screw parts, and reinstall the planks with your desired spacing. I could not find new deck screws with square holes, so I bought the torx head deck screws. Junk gets in there and holds moisture, and then the joists start to rot form the top down. DRILLS Install Trex recommended fasteners. If you do leave a gap between the boards, be sure to regularly clean the top of the joist between the boards. To install composite decking with a hidden fastening system, start at the house by face-screwing the first board. ![]() After removing the boards, I used a Sawzall to cut off the screw parts that stayed behind. All the screws were rusty, so I threw them away. I used an impact, and most came out, some broke. I used an ice pick to clean out each square hole. All Ipe Clip Hidden Deck Fastener systems have Stainless Steel T10 - Star Drive Screws included in them. The Trex was installed with square head deck screws. Install the initial face screws for the first board. Recently I had to replace a few joists and a section of the ledger board because they start to rot after 50 years. Installing a Breaker Board 16:12 Design your dream deck before you build it. Installing Trex Hideaway Hidden Fasteners 09:27 06. Notching Around Guardrail Posts 03:08 04. Should have replaced the joists at that time, but that is another story. Positioning the First Deck Board 01:00 03. To install composite decking with a hidden fastening system, start at the house by face-screwing the first board. Trex decking was installed over the existing 40-year old joists. I have an impact driver - would that be the best to reduce cam out and have the best success getting the old screws out? Any other comments or tips would be appreciated. Wondering how difficult it will be to get these out. How the edge of decks are edged changed after we had this done and the angle on the edge catches lots of crud. If I do that I suppose I should start at the deck edge and work toward the house. I can trim the last board at the edge of the deck as it uses a vinyl angle over the edge and a large J over the rim board - come to think of it I may overhang the Trex if I think I will have enough material to revise that. I may bevel the bottom edge to make sure it doesn't meet the ledger board. The one next to the house can be moved over enough to use new screw holes into the joists. ![]() Thinking I will take up the trex and move each piece out a slight amount. Use the Trex Hidden Fastener Tool for Quicker Fastener Installation Another way of installing fasteners is with the Hideaway. have considered running a saw down the slots to open them up but not sure I could make it look good and couldn't get up to the ends and parts along the house which also have drainage issues. The decking is still in good condition so want to do something to improve drainage. This was installed about 15 years ago before the edge clips came into use (which set the spacing). When our deck was done they didn't space the boards much - barely a crack between boards so they plug up and don't allow water through. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |